Dnieper Hydroelectric Station

From Wikipedia, the free encyclopedia

(Redirected from DnieproGES)
Jump to: navigation, search

Coordinates: 47°52′09″N, 35°05′13″E

The Dnieper Hydroelectric Station (or DniproHES) is the largest hydroelectric power station in Ukraine and one of the largest in Europe. It is situated on the Dnieper River in Zaporizhzhia. The earliest plans for a hydroelectric station date back to 1905, but plans for a dam to inundate the Dnieper Rapids and make the whole length of the river navigable had been made in the 19th century. One of the designs for a station was proposed by a Ukrainian engineer, Mohylko[1].. The design that was acccepted dates back to the GOELRO electrification plan for the USSR, which was adopted shortly after the October Revolution of 1917 and was designed by Ivan Aleksandrov. .

Leon Trotsky, by then out of power, campaigned for the idea within the ruling Politburo in early 1926. In a speech to the Komsomol youth movement, he said:

In the south the Dnieper runs its course through the wealthiest industrial lands; and it is wasting the prodigious weight of its pressure, playing over age-old rapids and waiting until we harness its stream, curb it with dams, and compel it to give lights to cities, to drive factories, and to enrich ploughland. We shall compel it! [2]
DniproHES dam, 1947
DniproHES dam, 1947

The dam and its buildings were designed by the Constructivist architects Viktor Vesnin and Nikolai Kolli. Construction began in 1927 and was finished in 1932, creating the first hydroelectric plant in the Ukrainian SSR. Generating some 650 MW, the station became the largest Soviet power plant at the time. American specialists under the direction of Col H. Cooper took part in the construction. All the building machines and the first electrical equipment were imported from the United States[3]. The industrial centres of Zaporizhia, Kryvy Rih and Dnipropetrovsk grew from the power provided by the station, including such energy-consuming industries as aluminum production, which was vitally important for Soviet army aviation.

Under construction circa 1930
Under construction circa 1930

During World War II, the strategically important dam and plant were partially destroyed by retreating Soviet troops in 1941, and then again by the retreating German troops in 1943. In the end the dam suffered extensive damage, and the powerhouse hall was nearly destroyed. Both were rebuilt between 1944 and 1949. Power generation was restarted in 1950. In 1969-80, the second powerhouse was built with a planned production capacity of 836 MW.

DniproHES today, seen from Khortytsia island.
DniproHES today, seen from Khortytsia island.

Currently, the dam is over 800 metres long and 61 metres high. When constructed it raised the level of the Dnieper by 37 metres, flooding the rapids above and making the entire Dnieper navigable. Over its long history, the dam was hailed as one of the biggest achievements of Soviet industrialization programs. Today the dam has been privatized and continues to fuel the adjacent industrial complexes with an output of 3,64 billion kW hours. The pressure of the water leaving the dam is at 38,7 metres and the reservoir that is behind it is 33.3 cubic kilometres. The dam is also used by automobile traffic as it is the only second point in the city of Zaporizhia to cross the river.

Commemorative 5 hryvnia coin Commemorative 5 hryvnia coin
Commemorative 5 hryvnia coin


  1. ^ Encyclopedia of Ukraine
  2. ^ Quoted in Isaac Deutscher. The Prophet Unarmed: Trotsky: 1921-1929, Oxford University Press, 1959, reprinted by Verso, 2003, ISBN 1-85984-446-4, p.178
  3. ^ Encyclopedia of Ukraine

Advanced Search
Included Web Search Engines


Safe Search

close

Top Matching Results

Occasionally Search.com will highlight specialized results that are based on the context of your query. Examples of specialized results include specific links to news, images, or video.

Top Matching Results may highlight information from other Search.com pages, content from the CNET Network of sites, or third party content. The listings are based purely on relevance. Search.com does not receive payment for listings in this section but our partners that provide this data may get paid for listing these products.

Sponsored Links

This section contains paid listings which have been purchased by companies that want to have their sites appear for specific search terms and related content. These listings are administered, sorted and maintained by a third party and are not endorsed by Search.com.

Search Results

Search.com sends your search query to several search engines at one time and integrates the results into one list which has been sorted by relevance using Search.com's proprietary algorithm. You can customize the list of search engines included in your metasearch from the preferences.

The search engines that are used in your metasearch may allow companies to pay to have their Web sites included within the results. To view the Paid Inclusion policy for a specific search engine, please visit their Web site. Search.com does not accept payment or share revenue with any search engine partner for listings in this section.